Recycled Formwork for Building Materials

Product Details
Customization: Available
After-sales Service: 2 Years
Warranty: 2 Years
Still deciding? Get samples of US$ 35/Piece
Request Sample
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
8
Year of Establishment
2022-09-19
  • Recycled Formwork for Building Materials
  • Recycled Formwork for Building Materials
  • Recycled Formwork for Building Materials
  • Recycled Formwork for Building Materials
  • Recycled Formwork for Building Materials
  • Recycled Formwork for Building Materials
Find Similar Products
  • Overview
  • Product Description
  • Product Advantages
  • Installation Instructions
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
BZ-PP
Material
Polypropylene
Type
Slab Formwork
Color
Black/White and Black/White
Thickness
12-20mm
Feature
Durable and Waterproof
Reusable Time
More Than 50 Times
Advantage
No Need Oil
Transport Package
Pallet
Specification
2440*1220mm/1830*915mm
Trademark
Beizhu
Origin
China
HS Code
3925900000
Production Capacity
1000 PCS/Day

Product Description

Product Description

Recycled Formwork for Building Materials

The plastic concrete formwork produced by Sufeng uses polypropylene as basic material, adding chemical
additives toughening, flame resistance, weather resistance and anti-aging, smelt and form new construction
material through chemical molecular structure reorganization.
 

Hollow plastic formwork is according to the principle of structural mechanics, neatly arranged, increased
four times support, stronger and more robust;On both sides of the formwork are right angle processing,
increasing the bear capacity, construction is more convenient.

 

Hollow formwork principle also makes the product expansion coefficient small.
Recycled Formwork for Building Materials

STANDARD SIZE Quantity in 20ft Container Quantity in 40hq Container Weight
2440*1220*12MM 560 PCS 1260 PCS 21 KGS/PC
2440*1220*15MM 450 PCS 1120 PCS 24 KGS/PC
2440*1220*18MM 400 PCS 900 PCS 28 KGS/PC
2440*1220*20MM 350 PCS 850 PCS 30 KGS/PC
Cutting and customized size are available.

Recycled Formwork for Building Materials
Recycled Formwork for Building Materials
Recycled Formwork for Building Materials
Recycled Formwork for Building Materials
1. Light weight, high strength, high hardness, impact resistance, wear resistance.
2. Surface is smooth, bright and clean; Concreting and forming effect is good for Beizhu concrete formwork.
3. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water,
no bubbles, sheet size stability, especially suitable for underground and damp environment.

4. Good toughness. Beizhu concrete formwork could be used as cambered special-shaped formwork.
5. Acid and alkali resistance, corrosion resistance; Beizhu concrete formwork is very suitable for the
engineering application in coastal areas, mine, as well as seawall. Beizhu concrete formwork needs not do
any preservative treatment both in using and storing the formwork, which do not pollute the concrete surface.

6. The reusable time for Beizhu concrete formwork can reach more than 60 times, long service life.
7. Waste products can be recycled and reprocessed, making full use of waste materials. This property can
greatly reduce the project cost compared with wooden formwork and bamboo formwork.

8. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas.
9. Demould easily. No need brushing release agent, only tapping, the Beizhu concrete formwork will fall off.
Shorten working hours and speed up the construction schedule efficiently.

10. Easy to process. Sawing, drilling and nailing are all available. Beizhu concrete formwork can be combined
vertically and horizontally optionally.

11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate,
advantageous to the organization construction, effectively improving the construction schedule.
Product Advantages
Recycled Formwork for Building Materials
Recycled Formwork for Building Materials

Recycled Formwork for Building Materials

1. Waterproof. Won't deform and warp, can be used in damp enviroment;
2. Good strength and toughness. Won't break edges and corners when mould removal, won't fracture;
3. Durable. Can be reused more than 50 times, 1 set formwork can finish whole high buiding 2×30 floors,
save 50% total budget than plywood and metal formwork;
4. Need no releasing agent. Because of incompatibility of plastics and cement;
5. Light weight. Easier to carry and release worker from heavy labor. Manual operation, no crane required;
6. Surface need no maintenance. High pressure water jet can be used to flush the surface;
7. High workability. User-friendly, can be nailed, drilled, cut, etc. Compatible with other materials such as
plywood, steel, aluminum, etc.
Recycled Formwork for Building Materials
Installation Instructions

Recycled Formwork for Building Materials

Remark:

1) Please use tungsten steel saw blade with over 80 meshes when you cutting the plastic formwork.

2) Please avoid the peak temperature in one day when matching the mold. Then the effect after releasing
mould is better.

3) Please place the PP formwork as flat as plywood formwork prevent the deformation after releasing the mould.

4) Please have your building workers skill trained when you use PP formwork first time. This is an essential part.
Recycled Formwork for Building MaterialsRecycled Formwork for Building MaterialsRecycled Formwork for Building Materials
General Operation And Notes Of Instrument For Beizhu concrete formwork :
1. Method of use as well as wooden formwork, Beizhu concrete formwork reinforcement direction with batten
direction placed in cross shaped.

2. No need to smear the mold release agent before using Beizhu concrete formwork.
3. When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between
the wall plate and keels hould be 10 ~ 20 cm. BEIZHU Beizhu concrete formwork don't need releasing agent.

4. The seam-line between Beizhuconcrete formwork should be taped.
5. The length of nail should not be too long, generally about 30 ~ 35 mm.
6. The strength to drive nailsshould be moderate.
7. When removing the Beizhu concrete formwork, please start from the small part of one end, the support and
the plates should be removed at the same time aiming at preventing the template widespread drops, don't let
the corner drop on the ground vertically.

8. The Sufeng concrete formwork accesses to be mixed used with wood veneer, bamboo veneer and other
material plate.

Company Profile

Shanxi SUFENG New Material Technology Co.,Ltd produced plastic concrete formwork since 2008 and
exported since 2005. We have past the certificate of ISO9001:2008 International Quality System in 2015;
The plastic concrete formwork has been accepted and applied in construction in China, India, Australia,
Singapore, UAE, Finland, Mexico and other countries. We have got the positive feedback from our
customers. This new construction material will be popular and used widely all over the world.

Recycled Formwork for Building MaterialsRecycled Formwork for Building MaterialsRecycled Formwork for Building Materials

FAQ

Q: Are you a factory or trading company?
A: Factory.
Q: How can I get the sample?
A:We provide sample free of charge 3-7 work days.
Q: What payment terms do you do?
A: 30% T/T as down payment, the balance paid by T/T before shipment
or 100% irrevocable L/C At sight.
Q: What is your MOQ for Beizhu concrete formwork?
A: We have some stock for normal size, so it depends on your requirement.
Q: How long is your delivery time?
A: 10-15 work days.
Q: How to pack the product?
A: On pallet and carton or as customers' requirement.
Q: How many quantity can load for one 20/40 container?
A: For 18mm thickness, 400PC/20GP container, 900PC/40HQ container.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier